Wednesday 30 November 2011

week 27 unitec carpentry 26 - 28 october 2011

the all blacks have won the rugby world cup. new zealand is ecstatic. and we go back to school after a 2 week break. this week we continue with the installation of gib boards. apart from standard and braceline gib boards, we also installed aqualine to wet areas.

gib board installed to one side of this kitchen wall to form alcove for refrigerator
photograph above shows the use of red spacers and blocks to create a recess along square edges along the sides of ceiling plasterboard. this will be taped and skimmed to provide a flush finish.


cradle for bath with studs rebated to ensure aqualine gib board overhangs bath by 10mm
aqualine gib board installed sides of bath with 10mm overhang




No comments:

Post a Comment