Monday 31 October 2011

week 25 unitec carpentry 28 - 30 september 2011

week 25. insulation batts arrived this week. made from polyester fibre, they are rated 180mm R3.2 for ceiling and 100mm R2.2 for walls. we cut them with a handsaw to fit snugly between studs. crevices at the corners are stuffed with ribbons of insulation offcuts.

insulation batts for the ceiling are thicker than those for the walls, laid across the ceiling battens with staggered joints; note no gaps
wall insulation is fitted between studs; note: building wrap is trimmed around window and turned up before stapling to sides and gap between window frame and wall frame is sealed with expanding foam

wall insulation batts fit snugly between studs and between sill and bottom plate



No comments:

Post a Comment