joey explaining architectural matters on our walkabout at the start of the course |
joey briefing us on tasks for the day at a typical toolbox talk
|
house 124 at completion |
on a clear day you can see forever! |
joey explaining architectural matters on our walkabout at the start of the course |
joey briefing us on tasks for the day at a typical toolbox talk
|
house 124 at completion |
on a clear day you can see forever! |
photograph shows shelves in linen cupboard. we also installed hanging rails and shelves in the wardrobes. |
kitchen cabinets installed by supplier. note we had to trim back skirting to allow base units to butt into wall |
we fabricate a temporary stand to raise the vanity to correct height for installation |
aqualine gib board installed over shower tray with 10mm overhang |
shower linings and glass door are installed by supplier |
photograph shows architrave and skirting fitted to range slider. |
photograph shows ceiling access manhole opening finished and fitted with architrave |
photograph shows skirting fitted to wall. note expanded metal corner angle for gib stopping. |
photograph shows architrave fitted to window with 3mm quirk |
photograph shows architrave fitted to door frame with 3mm quirk all round as negative or shadow detail |
gib board installed to one side of this kitchen wall to form alcove for refrigerator |